By using a balanced site approach OSG was able to save the project the additional costs of importing and exporting material. Clean structural fill was able to be excavated from an onsite drainage gallery and placed onsite. Building footings were excavated, backfilled, and building slab placed on native material. While storm water remained onsite both fire water service and sanitary sewer was connected to existing city owned mains.